Reserve from the case
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 22 - Aug 27
Reserve from the case
Ships within 48 hours · Estimated delivery Aug 22 - Aug 27
They are installed at the lower end of the suction hose and consist of strainer (mesh size 0
Degassing drive strategy in case of air bubbles detected in the dosing head and Auto Deaeration during pump standby avoids stand-still due to air-locking
Wall thickness: 4 mm
or a DMX model 221 dosing pump
after-run function
pressure loading valves 95730749 They are installed at thePressure loading valves provide a constant counter pressure and prevent siphoning They are installed in the discharge line after the pressure relief valve, and after the pulsation damper, if fitted.
US$ 24.90
US$ 16.90
US$ 11.90
US$ 159.90
US$ 40.00
US$ 14.00
US$ 42.99
US$ 36.00
US$ 21.00
US$ 59.13
US$ 19.90
US$ 29.00
US$ 21.00
US$ 20.00
US$ 41.50
US$ 22.00
US$ 46.00
Pay in 4 interest-free payments of $26.16 Learn more